Improvement in reliability of Ducato Auto HV testing by addressing issues caused by loose connections
Implementation of a timer system for monitoring raw material pre-heating time in hopper dryers to enhance process accuracy and efficiency in injection moulding
Optimization of changeover time in the injection moulding shop through the implementation of an additional connector (Yudo) on HRS multiple input.
Enhancement of operator safety through the introduction of an alarm system interlocked with the overhead crane.